HyLoft 00625 Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 9
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
ATTACH DOWNRODS
and SUPPORT BARS
PLACE AND ATTACH GRIDS
Ceiling Joist
2A
2B
Connect two-Piece
Downrods to center
hole in Ceiling Angle
Insert end plugs
before attaching
M
M
Connect Support Bars
to Downrods
3A
Lay both 15" Wire Grids (A)
evenly on Support Bars and
attach as shown. Note: Long
grid wires are on the bottom.
3B
Lay 13" Wire Grid (B) on top of
Support Bars, between the two
15" grids (A), and Bolt Together
using 2 bolts (J), washers (L)
and nuts (K) on each side.
Adjust
Downrods
to Desired
Length
Sticker
four-wire clusters
nearest downrods
You have now completed the installation and are ready to load your new HyLoft Storage Unit.
(Maximum 250 lbs. per 45" x 45" unit, evenly distributed). Place the sticker provided on a
support bar for easy reference information.
Periodically (at least annually) check all connections to ensure that they remain tightly fastened.
Installing Two HyLoft 45 x 45 Units:
Follow the instructions above. Multiple Units may be joined together by using tie straps provided.
v.44010306 Page 4 of 15
Page view 2
1 2 3 4 5 6 7 8 9

Comments to this Manuals

No comments